Turnkey Gas Stations

Establish the new site for Gas Station

Turnkey Project Execution for conducted following scope.

  1. Site Establishment:

    • Conduct site surveys, soil tests, and obtain necessary permits.

    • Clear and level the land for construction of a facility.

  2. Fuel Dispensers and Canopy:

    • Design and install a modern canopy structure over fuel dispensers.

    • Set up multiple fuel dispensers with integration for different fuel types.

  3. Underground Fuel Tanks:

    • Install two 50,000-liter capacity underground fuel tanks, following environmental and safety regulations.

    • Conduct leak testing and ensure compliance with local fuel storage standards.

  4. Retail Shops and Facilities:

    • Build commercial units (shops) within the gas station premises.

    • Integrate services such as convenience stores and restrooms for customers.

  5. Safety and Compliance:

    • Implement fire suppression systems, proper signage, and security measures.

    • Ensure compliance with all safety, environmental, and industry standards.

  6. Project Management:

    • Provide end-to-end project management, including scheduling, budgeting, contractor supervision, and quality control.

    • Coordinate procurement, installation, and testing of all equipment and infrastructure.

    • Conduct final inspections and handover upon completion.

  7. Handover:

    • Handover the fully operational site with all facilities ready for use, ensuring adherence to the Mobil brand’s standards and client expectations.

Timeline: Estimated at 9-12 months from project inception to completion.